Close Menu
  • Home
  • News
  • Opinion
  • Sports
  • World News
  • Crime
  • Entertainment
  • Health
  • Business
  • Politics
What's Hot

Ondo South Senator’s Seat Declared Vacant by Akpabio

April 28, 2026

Court Invites Eloho, Obazee as Witnesses in Emefiele’s $6.23m Case

April 28, 2026

Osinbajo Narrates His Experience With Alcohol

April 28, 2026
Facebook X (Twitter) Instagram
Tuesday, April 28
Access TV Nigeria
Trending
  • Ondo South Senator’s Seat Declared Vacant by Akpabio
  • Court Invites Eloho, Obazee as Witnesses in Emefiele’s $6.23m Case
  • Osinbajo Narrates His Experience With Alcohol
  • Davido Emerges Victorious at 2026 Liberian Entertainment Awards
  • Gov. Otti Flags Off 6 Year Primary School Curriculum in 3 Years
  • Emefiele: Witness Narrates How $6.23 billion Was Moved from CBN Coffers to Fund Foreign Observers of 2023 Election
  • ADC, PDP Dismissed Joint Presidential Ticket
  • FCT Chapter of NUT Halt Strike
  • Home
  • News
  • Opinion
  • Sports
  • World News
  • Crime
  • Entertainment
  • Health
  • Business
  • Politics
Access TV Nigeria
  • Home
  • News
  • Opinion
  • Sports
  • World News
  • Crime
  • Entertainment
  • Health
  • Business
  • Politics
Home » Posts » FEC Approves More Than 5 Major Roads Across Nigeria
News

FEC Approves More Than 5 Major Roads Across Nigeria

adminBy adminMarch 5, 2026No Comments3 Mins Read
WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr VKontakte Email
Share
Facebook Twitter LinkedIn Pinterest Email

The federal government, on Wednesday, approved six major road projects across the country.

It also approved the demolition of the Carter Bridge in Lagos and the redesign of a new one.

The Minister of Works, David Umahi, disclosed this while briefing State House correspondents on the outcome of the Federal Executive Council (FEC) meeting presided over by President Bola Tinubu.

-Ibadan–Ife–Ilesa Road Reconstruction: Reconstruction of 103 km dual carriageway (re-awarded after minimal prior progress) awarded for ₦427 billion;

-Kano–Kongolam Road: Review, rescoping, and redesign of 132 km road to a three-lane concrete carriageway (linking Kano, Jigawa, and Katsina states, includes solar lights and CCTV) awarded for ₦334 billion.

Keffi–Nasarawa–Abaji Road Phase Two: Rehabilitation of 129.3 km road awarded for ₦203 billion;

-Suleja–Minna Road Completion: Completion of the remaining 71 km dual carriageway (one carriageway) awarded for ₦91 billion;

– Carter Bridge Project: Detailed design, costing, and preparation for demolition of existing bridge + new bridge construction (Lagos) awarded for ₦5.6 billion (for design phase by Advanced Engineering Consultants);

-Abuja–Lokoja Road Reconstruction: Reconstruction of 86 km affected section (with multiple contractors, including Julius Berger) awarded for ₦146 billion.

Mr Umahi explained that the reconstruction of the Ibadan–Ife–Ilesa Road was awarded by the previous government, though there was little progress on the project when the Tinubu administration assumed office, hence it was reviewed and re-awarded.

On the Kano-Kongolam Road, he said the four-year-old project was initially planned as an asphalt road but will now be a three-lane concrete carriageway. He added that the upgraded design now includes solar-powered streetlights and closed-circuit television (CCTV) installations.

The minister said Phase Two of the Keffi–Nasarawa–Abaji Road rehabilitation project will significantly improve connectivity between Nasarawa State and the Federal Capital Territory (FCT).

Mr Umahi said the Suleja–Minna Road was originally awarded to Salini Construction Company but was terminated due to poor job done. He added that only 10 km of the road was completed before the termination of the contract.

He also stated that FEC decided to complete the remaining 71 kilometres of the dual carriageway, with one carriageway contracted and awarded to China Geo-Engineering Corporation (CGC) while the second carriageway had been cleared from the Bureau of Public Procurement (BPP).

The minister explained that the technical evaluation done on the Carter Bridge revealed that it can no longer be rehabilitated, hence the decision to demolish it and replace it.

On the Abuja–Lokoja Road, Mr Umahi said it would now be reconstructed using reinforced concrete and handled by five contractors, including Julius Berger, which is already executing other segments along the corridor.

The minister said the government planned to commission at least four road projects in each of the six geo-political zones by 15 May.

Share. WhatsApp Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleAirport Cashless Policy Suspended by Tinubu
Next Article EFCC Arrests Man for Alleged Naira Abuse in Enugu
admin
  • Website

Related Posts

Ondo South Senator’s Seat Declared Vacant by Akpabio

April 28, 2026

Court Invites Eloho, Obazee as Witnesses in Emefiele’s $6.23m Case

April 28, 2026

Osinbajo Narrates His Experience With Alcohol

April 28, 2026

Gov. Otti Flags Off 6 Year Primary School Curriculum in 3 Years

April 28, 2026
Leave A Reply Cancel Reply

Our Picks

Recent Posts

  • Ondo South Senator’s Seat Declared Vacant by Akpabio
  • Court Invites Eloho, Obazee as Witnesses in Emefiele’s $6.23m Case
  • Osinbajo Narrates His Experience With Alcohol
  • Davido Emerges Victorious at 2026 Liberian Entertainment Awards
  • Gov. Otti Flags Off 6 Year Primary School Curriculum in 3 Years

Recent Comments

  1. Katie685 on More Than 3,600 Arrested by Iran on War Related Charges
  2. Christian36 on Gov. Fintiri Unites APC in Adamawa
  3. Ayden4711 on Tinubu Mocks ADC For Disobedience of Court Orders, Say They Held Street Convention
  4. Gretchen1811 on Atiku Hosts Adamawa ADC Stakeholders in His Abuja Residence
  5. Mona4757 on ADC 2027 Ticket: Only The Party Can Decide Wo Emerge Victorious
About Us
About Us

Access TV is a vibrant online news and entertainment platform dedicated to bringing Nigerians closer to the stories that matter most. We provide accurate, engaging, and up-to-date coverage of news, politics, entertainment, business, technology, lifestyle, and sports — all from a uniquely Nigerian perspective.

Email Us: joelaluge@gmail.com
Contact: +2348078784451

Categories
  • Business
  • Crime
  • Entertainment
  • Health
  • News
  • Opinion
  • Politics
  • Sports
  • World News
Our Picks

Archives

  • April 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025

Categories

  • Business
  • Crime
  • Entertainment
  • Health
  • News
  • Opinion
  • Politics
  • Sports
  • World News
Facebook X (Twitter) Instagram Pinterest
  • Home
  • Posts
  • About Us
  • Contact
  • Privacy Policy
© 2026 Access Tv. Designed by Domo Tech Hub.

Type above and press Enter to search. Press Esc to cancel.